Separate names with a comma.
Ok... bottom pinned and shimmed [img] While I was waiting for my help... Rough cut filter sock holder and bio drip tray...
I will be shipped off by then, but i should have others being built
Filpped this morning and bonded in the rest of the bars. Turned out OK for flush bonding. Lots of bubbles on a few of them, but not much else I...
rack holders [img] Tank on end [img] hard to see them in this pic [img] better here [img] The 2 closest bars hold one side of the lower...
Got the rack holders cut and routed tonight, and half of them installed. Waiting until after the kids go to bed to flip the tank and install the...
Flush trimmed the bottom [img] I didn't think I was going to be able to do this, but after a "duh" moment, I realized I could rather...
Got the top euro done last night [img] [img] And put on this evening! [img] This one may be at Spring Fest, without the...
Bottom on [img] Flush trim, round & polish tomorrow This one will be at Spring Fest
Flush trim done [img] Round & polish tomorrow. This one will be at Spring Fest
Hey guess what! [img] [img]
Top eurobrace bonded on [img] Mike (MJB, not Money Mike) made me take this pic. I ran out of weight and folding chairs was all I could...
Bottom on. [img] Just a flush trim and round tomorrow, then a quick sand and buff and she's done!
Bonded it all last night and let sit for the day. Next step: make the eurobrace [img]
Other side of overflow fence [img] kind of. I hang my head in shame at imperfection. I somehow ended up with the overflow fence 1/16"...
Holes for bulkheads routed [img] Started with the end panel [img] I let that sit for about 4 hours or so (more like 6) because...
Made the eurobrace, needed to do that so I could figure out clearance for the bulkhead [img] [img] Then routed the bulkhead hole...
45x 660nm Deep Red and 5x 455nm Royal Blue. Any LED grow light you see looks like this.
Drilled & tapped [img] [img] [img] Thumbscrews hold it all together [img] Holes drilled for fixture power cords...